



- Technology Consulting:
- Operations Strategy
- Capital investments and break even analysis.
- Parts distribution methodology from inventory shelf to manufacturing floor facilitating the tracking and accountability parts distribution.
- Manufacturing capacity analysis
- Capacity Management
- Resource requirements based on workload distribution among multi-line work centers.
- Manufacturing Flow-chart and matrices
- Frame work for sequence of events (SoE) journals, work instructions and assembly logs
- Bill of Materials (BOM) to support modular manufacturing techniques
- Balance value-added and non-value added activities
- Lean Six-Sigma
- Facilitate 5S, the science behind good house-keeping
- ERP / MRP II Implementation
- Balanced - Score Card Measurement systems
- Project Management
- Six Sigma process control
- Lean / J.I.T. / ERP Integration
- Inventory Reduction Programs
- Plant Layout
- Cellular Manufacturing
- Quick Changeover
- Kaizen/Rapid Improvement
- Manufacturing Strategies
- Bar code system implementations
- MRP & MRP 11
- J.I.T/MRP Integration
- Systems Analysis
- Kaizen/Rapid Improvement
- Raining and Development
- Inventory Management
- Inventory requirement based on the average aggregated inventory value
- Shelf and bin location for each part number, implemented real-time part tracking system, Synchronous to the existing ERP system, Bar-coding
- Minimum/maximum stock size
- Minimum order quantity based of economies of scale (The bath-tub curve method)
- Supply Chain Management
- Manage supplier selection and certification program based on
- Core competence
- Financial strength
- Warehouse location
- Quality control system,
- JIT delivery record and transportation mode
- Decision making fram-work for outsourcing
- Electronic purchasing system
- Parts forecasting based on linear regression method
- Integrated supply-chain dynamics
- Supply-chain performance
- Manage supplier selection and certification program based on
- Quality Engineering
- Total Quality Management (TQM) system
- Change management process
- ISO 9001 audit, readiness evaluation and registration preparedness
- Benchmark quality requirement
- Implement, measured and improved Key Process Improvement (KPI)
- Define and measure quality based on Statistical Process Control (SPC)
- Implementation of Six-Sigma
- Research and devise tools for quality control
- Reduce cost of quality (failure cost)
- Implement inspection process
- Managed Services:
- Corporate Marketing
- Strategized customer satisfaction, value and retention
- Measured market demand
- Analyzed buyer behavior
- Performed competitor analysis
- Positioned products through market trend analysis
- Managed integrated marketing communications
- Designed pricing strategies and programs
- Project Management
- Project assessment
- Project initiation
- Project planning work break down analysis
- Team building and management
- Contingency planning and risk management
- Budgeting and cost analysis
- Project reporting and lessons learned database
- Project rescue and recovery
- Business Analysis
- Business Process re-engineering
- Business analysis
- Gap Analysis
- Future state plans
- Process improvement
- Strategic Plan development
- Flow charting and process mapping
- Environment, Health and Safety
- Environmental study and modeling
- Health and safety analysis
- Loss management
- ISO 14001 audit, readiness evaluation and registration preparedness
